Lars-André Tokheim, Reports from 2006 onwards Home
2023: R.M. Jacob and L.A.
Tokheim, “ELSE 2 D3b: Electrical resistance heating of calciners – Powder
behaviour simulation”, Report 6000239-D4, USN, December 2022 L.A. Tokheim and R.M. Jacob,
“ELSE 2 D3b: Electrical resistance heating of calciners – Waste heat
considerations”, Report 6000239-D3c, USN, December 2022 R.M. Jacob and L.A.
Tokheim, “ELSE 2 D3b: Electrical resistance heating of calciners – Reactor
design”, Report 6000239-D3b, USN, December 2022 R.M. Jacob and L.A.
Tokheim, “ELSE 2 D3a: Electrical resistance heating of calciners – Mass and
energy balance”, Report 6000239-D3a, USN, December 2022 2022: L.A. Tokheim and R.M. Jacob,
“ELSE 2: KilnZero axial resistance heating experiments”, Report 6000239-D2x,
USN, June 2022 L.A. Tokheim, “RFF-VT Recycling and carbonation of concrete waste – pre-study: M5
Summary Report”, Report, USN, 18 February 2022 L.A. Tokheim, “RFF-VT Recycling and carbonation of concrete waste – pre-study: M4
report”, Report, USN, 2 February 2022 2021: L.A. Tokheim and R.M.
Jacob, “ELSE 2 D1a: Electrical resistance heating of
calciners – different reactor options”, 6000239-D1a, USN, 27 September 2021 2019: I. Husum, L.A. Tokheim,
K.H. Karstensen, “Optimised use of RDF as substitute for Coal at
Norcem Brevik Cement Plant (BIA
project number 245690)”, Report, September 2019 L.A. Tokheim, “NFR BIA project 245690/O30: Optimised and increased use of Refuse
Derived Fuel as substitute for coal at Norcem Brevik cement plant - Results
from full-scale RDF tests at Norcem Brevik, 26-27 September 2018”, Report,
April 2019 L.A. Tokheim, A.
Mathisen, L.E. Øi, C. Jayarathna, N.H. Eldrup,
“Combined calcination and CO2 capture in cement clinker production
by use of CO2-neutral electrical energy – Phase 1: Technical
feasibility and early-phase cost-estimate – Deliverable No. 6: Final report”,
Report, March 2019 A. Mathisen, L.A.
Tokheim, C. Jayarathna, L.E. Øi, N.H. Eldrup,
“Combined calcination and CO2 capture in cement clinker production
by use of CO2-neutral electrical energy – Phase 1: Technical feasibility
and early-phase cost-estimate – Deliverable No. 5: Cost estimation of
promising ELSE concepts”, Report, March 2019 A. Mathisen, L.A.
Tokheim, C. Jayarathna, L.E. Øi, “Combined
calcination and CO2 capture in cement clinker production by use of
CO2-neutral electrical energy – Phase 1: Technical feasibility and
early-phase cost-estimate. Deliverable No. 4 CO2 product stream
characteristics”, Report, January 2019 2018: L.A. Tokheim, “Combined calcination and CO2 capture in cement clinker
production by use of CO2-neutral electrical energy – Phase 1:
Technical feasibility and early-phase cost-estimate. Deliverable No. 2
Process flow diagrams, mass flow rates, temperatures, CO2 reduction and
energy consumption and Deliverable No. 3 Impacts on the cement production
process”, Report, October 2018 A. Mathisen, L.A.
Tokheim, C. Jayarathna, L.E. Øi, N.H. Eldrup,
“Combined calcination and CO2 capture in cement clinker production
by use of CO2-neutral electrical energy – Phase 1: Technical
feasibility and early-phase cost-estimate – Deliverable No. 1: Technical
description of promising high temperature heat transfer concepts based on
electrical energy”, Report, October 2018 L.A. Tokheim, “NFR BIA project 245690/O30: Optimised and increased use of Refuse
Derived Fuel as substitute for coal at Norcem Brevik cement plant - Results
from full-scale RDF tests at Norcem Brevik, 17-18 January 2018”, Report, June
2018 L.A. Tokheim, “NFR BIA project 245690/O30: Optimised and increased use of Refuse
Derived Fuel as substitute for coal at Norcem Brevik cement plant -
Computational Particle and Fluid Dynamics simulation of the Pyroclone at
Norcem Brevik”, Report, May 2018 2017: L.A. Tokheim, N. Eldrup
and A. Mathisen, "CO2 Capture Test Facility at Norcem Brevik,
Project Phase II, Test Step 1: Benchmarking Final Report", Report No.
2213050-5, Tel-Tek, June 2017, External Project for Norcem AS Brevik L.A. Tokheim, "PhD
Programme Process, Energy and Automation Engineering – Annual Report 2016",
University College of Southeast Norway, April 2017 2016: A. Mathisen, H. Sørensen, L.A. Tokheim and H.A. Haugen,
"Flue gas cooling - Flue gas to fly ash treatment", Report No.
2215120, Tel-Tek, March 2016, external project L.A. Tokheim, "PhD
Programme Process, Energy and Automation Engineering – Annual Report
2015", University College of Southeast Norway, January 2016 2015: L.A. Tokheim, A.
Jacobsen, I. Husum and M. Folkestad, " Norcem Feasibility Study Deliverable 4: Cement
kiln operation, equipment and capacities", Report, TUC/Norcem, December
2015, External Project for Norcem AS Brevik L.A. Tokheim, N. Eldrup
and A. Mathisen, "CO2 Capture Test Facility at Norcem Brevik,
Project Phase II, Test Step 1: Benchmark Analysis (Revised Version)",
Report No. 2213050-4, Tel-Tek, December 2015, External Project for Norcem AS
Brevik L.A. Tokheim, A. Jacobsen, I. Husum and M.
Folkestad, "Norcem Feasibility Study, Deliverable 4: Cement kiln operation,
equipment and capacities", Report, Telemark University College and
Norcem, December 2015, External Project for Norcem AS Brevik L.A. Tokheim, " EDDiCCUT: Scoping for cement plant with
calcium looping ", Report No. 2212040-1, Tel-Tek, June 2015 L.A. Tokheim, "PhD
Programme Process, Energy and Automation Engineering – Annual Report
2014", Telemark University College, January 2015 2014: L.A. Tokheim, "CO2
Capture Test Facility at Norcem Brevik, Project Phase II, Test Step 1: Waste
Heat Potential", Report No. 2213050-3, Tel-Tek, June 2014, External
Project for Norcem AS Brevik L.A. Tokheim, "PhD
Programme Process, Energy and Automation Engineering – Annual Report
2013", Telemark University College, January 2014 2013: L.A. Tokheim, "CO2
Capture Test Facility at Norcem Brevik, Project Phase II, Test Step 1:
Benchmark Indicators", Report No. 2213050-2, Tel-Tek, September 2013,
External Project for Norcem AS Brevik L.A. Tokheim,
"Flyveaske som potensiell CO2-sorbent ved Norcem Brevik"
(Tel-Tek), Report No. 2213060-2, Tel-Tek, September 2013, External Project
for Norcem AS Brevik L.A. Tokheim, "CO2
Capture Test Facility at Norcem Brevik, Project Phase II, Test Step 1:
Benchmark Study Plan", Report No. 2213050-1, Tel-Tek, June 2013,
External Project for Norcem AS Brevik L.A. Tokheim, "CO2
Capture Test Facility at Norcem Brevik, Project Phase II, Test Step 1: Test
facility booster fan power", Report No. 2213060-1, Tel-Tek, June 2013,
External Project for Norcem AS Brevik L.A. Tokheim,
"Application for permission to carry out waste gypsum tests at the
Norcem limestone mine in Brevik" (in Norwegian), Report No. 2712020-1,
Tel-Tek, January 2013, External Project for Norcem AS Brevik L.A. Tokheim, "PhD
Programme Process, Energy and Automation Engineering – Annual Report
2012", Telemark University College, January 2013 2012: L.A. Tokheim, "Uncertainty
in determination of raw meal generated CO2 emissions based on raw
meal carbon content" (in Norwegian), Report No. 2711010-2, Tel-Tek, May
2012, External Project for Norcem AS Brevik L.A. Tokheim, "PhD
Programme Process, Energy and Automation Engineering – Annual Report
2011", Telemark University College, January 2012 2011: L.A. Tokheim,
"Annual Report 2011, PhD programme Process, Energy, and Automation
Engineering", Telemark University College, Faculty of Technology, 2011 F. Brakstad, L.A. Tokheim
and R. Arneberg: "Smart Manufacturing – a feasibility study on Cement
Mill No. 5 at Norcem Brevik", Report No. 9207020-3.1, Tel-Tek, December
2011, External Project for Norcem AS Brevik L.A. Tokheim,
"Method for determination of CO2 emissions from raw materials
used in clinker production" (in Norwegian), Report No. 2711010-1,
Tel-Tek, December 2011, External Project for Norcem AS Brevik L.A. Tokheim,
"Norcem Brevik Kiln 6 Exhaust Gas Waste Heat Utilization
Potential", Report No. 2210100-1, Tel-Tek, April 2011, External Project
for Norcem AS Brevik 2010: L.A. Tokheim,
"Norcem Brevik Kiln 6 Exhaust Gas Characteristics 2008-2009",
Report, Tel-Tek, March 2010, External Project for Norcem AS Brevik L.A. Tokheim,
"Calculation of gas flow rate into the GSA system at Norcem
Brevik", Report, Telemark University College, April 2010, External
Project for Norcem AS Brevik 2009: L.A. Tokheim,
"Uncertainty in the heating value based method for determination of
fossil fraction in RDF" (in Norwegian), Report, Telemark University
College, October 2009, External Project for Norcem AS Brevik L.A. Tokheim,
"Fossil fraction in RDF and uncertainty in determination of CO2
emissions from RDF at Norcem Brevik – Main report" (in Norwegian),
Report, Telemark University College, April 2009, External Project for Norcem
AS Brevik L.A. Tokheim,
"Fossil fraction in RDF and uncertainty in determination of CO2
emissions from RDF at Norcem Brevik – Report no. 4: Handling of
uncertainty" (in Norwegian), Report, Telemark University College, April
2009, External Project for Norcem AS Brevik L.A. Tokheim,
"Fossil fraction in RDF and uncertainty in determination of CO2
emissions from RDF at Norcem Brevik – Report no. 3: Determination of fossil
fraction in RDF" (in Norwegian), Report, Telemark University College,
April 2009, External Project for Norcem AS Brevik L.A. Tokheim,
"Fossil fraction in RDF and uncertainty in determination of CO2
emissions from RDF at Norcem Brevik – Report no. 2: RDF sampling" (in
Norwegian), Report, Telemark University College, April 2009, External Project
for Norcem AS Brevik L.A. Tokheim,
"Fossil fraction in RDF and uncertainty in determination of CO2
emissions from RDF at Norcem Brevik – Report no. 1: RDF
characterization" (in Norwegian), Report, Telemark University College,
April 2009, External Project for Norcem AS Brevik 2007: L.A. Tokheim,
"Potensial emissions of heavy metals from seawater scrubbing of SOx
at Norcem Brevik" (in Norwegian), Report, Telemark University College,
December 2007, External Project for Norcem AS Brevik L.A. Tokheim,
"Potensial emissions of mercury from seawater scrubbing of SOx at Norcem
Brevik" (in Norwegian), Report, Telemark University College, November
2007, External Project for Norcem AS Brevik |